WATER DISPUTE BETWEEN PAKISTAN AND INDIA – General Knowledge – Online M.C.Q’s for Competition Commission JOB Exams
Category : General Knowledge Topic : WATER DISPUTE BETWEEN PAKISTAN AND INDIA Basic Purpose : Online Preparation for Competition and Commission Exams for different Jobs/Recruitments in Pakistan , India, Bangladesh, Nepal, Bhutan, Afghanistan, Iran and China etc. Test Type : Multiple Choice Questions [MCQ’s]
WATER DISPUTE BETWEEN PAKISTAN AND INDIA - GENERAL KNOWLEDGE
WATER DISPUTE BETWEEN PAKISTAN AND INDIA - GENERAL KNOWLEDGE
Start
Congratulations - you have completed WATER DISPUTE BETWEEN PAKISTAN AND INDIA - GENERAL KNOWLEDGE.
You scored %%SCORE%% out of %%TOTAL%%.
Your performance has been rated as %%RATING%%
Your answers are highlighted below.
Question 1
Despite the spring of Indus Water Treaty which other dispute emerged in 1985?
A
Uri-ll
B
Kishanganga project
C
Wullar Berrage
D
Pakal Dul Dam
Question 2
Which of the following countries are in conflict with India on water sharing issue?
A
Bangladesh
B
Nepal
C
Pakistan
D
All of them
Question 3
Another proposed dam on chenab river in violation of Indus water treaty is called?
A
Burser Dam
B
Uri-ll
C
None of them
D
Pakal Dul Dam
Question 4
When Pakistan referred the Wullar Barrage dispute to Indus Water Commission, Which unfortunately failed to resolve the matter?
A
1987
B
1986
C
1988
D
1985
Question 5
Indus Water Treaty allows India the right to hydroelectric power generation from the western rivers but only by run off river installating without affection or building?
A
Volume of water
B
All of them
C
Storage capacities
D
Direction of water
Question 6
Which of the following was the major points of concern for pakistan which was/were raised by pakistan on Baghilar issue?
A
The gates were not designed at the highest level as required by Indus water treaty
B
Run of the river plant do not require a high dam of 475 feet
C
The calculation of poundage and firm powers in design is
D
All of them
Question 7
Indian Ministry of power has announced another dam on river Jhelum in clear violation of Indus water treaty. The dam is called?
A
Uri-ll
B
All of them
C
Burser Dam
D
Pakal Dul Dam
Question 8
The construction of the controversial gate structure of Baghliar could deprive Pakistan of more than?
A
7000 cusecs
B
5000 cusecs
C
6000 cusecs
D
8000 cusecs
Question 9
Kishanganga project contravenes the Indus water treaty because it is being built on river Neelum to divert its water to Wullar Barrage and impacts?
A
Pakistan prior right for its proposed 969 MW Neelum Jhelum hydropower project
B
Flow of the water in the river
C
None of them
D
Flow of the water in the river & Pakistan prior right for its proposed 969 MW Neelum Jhelum hydropower project
Question 10
On which river Baghilar Dam is being constructed by Indians, violating the Indus water Treaty?
A
Sutluj
B
Chenab
C
Jhelum
D
Ravi
Question 11
Just after partition , when did India cut off pakistan,s water supply without notice thus creating drought like condition?
A
February, 1948
B
May, 1948
C
March, 1948
D
Apr-48
Question 12
Raymond Lafitte belongs to which country?
A
France
B
Switzerland
C
Itlay
D
USA
Question 13
Apprehensions of Pakistan about the construction of Wullar Barrage were?
A
Control of water can destroy pakistan,s canal system
B
All of them
C
India can create a drought and flood condition in pakistan
D
In case of military confrontation India can control the mobility of pakistan forces
Question 14
In order to Iure pakistan into accepting the construction of Baghliar dam what offer was made by Indian government?
A
Dam height will be reduced for 475 feet
B
All of them
C
Pakistan can share 450 M/W of power with India
D
Inspection of dam will be allowed
Question 15
Baghilar dam if completed would effect Pakistan,s irrigation water supply especially in Rabl crop season it is apprenhended that pakistan may be deprived of water to the tune of?
A
35%
B
28%
C
20%
D
15%
Question 16
Kishanganga hydroelectric power project is another violation of Indian Water Treaty. This project is nearing completion with a 22 Km tunnel to divert the water of Neelum, river to Wuller Barrage, Neelum river is an integral part of?
A
Chanab
B
Ravi
C
Sutluj
D
Jhelum
Question 17
India Started the construction of Wullar Barrage in the year?
A
1983
B
1982
C
1986
D
1984
Question 18
A dam on river Jhelum before the Wullar lake can destroy which of the following canal system in pakistan?
A
Lower basic Doab
B
All of them
C
Upper Chanab
D
Upper Jhelum
Question 19
To solve water crises Indus Water Treaty was signed in 1960 under which who was to act as guarantor of this Treaty?
A
World Bank
B
None of them
C
IMF
D
Security Council
Question 20
The world bank appointed in May 2005 a neutral expert to resolve Baghliar dam who was neutral expert?
A
Raymond Lafitte
B
Rums John
C
Lord Morse
D
Joh F. Tarren
Question 21
After prolonged unsuccessful discussions when did Pakistan Commissioner Indus Waters asked for the appointment of a neutral expert to resolve Baglihar issue?
A
May, 2003
B
May, 2002
C
May, 2001
D
May, 2000
Question 22
Indus Water Treaty is primarily a Bilateral treaty with the world bank being?
A
Guarantor
B
Signatory
C
None of them
D
Witness
Once you are finished, click the button below. Any items you have not completed will be marked incorrect.
Get Results
There are 22 questions to complete.
←
List
→
Return
Shaded items are complete.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
End
Return
You have completed
questions
question
Your score is
Correct
Wrong
Partial-Credit
You have not finished your quiz. If you leave this page, your progress will be lost.